Bengaluru Metro Madavara-Nagasandra Commercial Operational Update

Photo of author

By user

The Bengaluru Metro Rail Corporation Limited (BMRCL) has recently received approval to begin commercial operations between Madavara and Nagasandra stations. The launch of this new metro line is expected to bring a new revolution in the traffic system of Bengaluru city. Let us know in detail about the various aspects of this important project.

New extension in the metro network

1. Importance of Madavara-Nagasandra section

The 3.7 km long section between Madavara and Nagasandra stations is an extension of the North-South Green Corridor of Bengaluru Metro. This section is specially built to enhance connectivity to the Bangalore International Exhibition Centre (BIEC), which is located on Tumkur Road.

2. Cost of construction

This extension has been constructed at a cost of approximately Rs 298 crore. It not only brings ease of transportation but also enhances connectivity to important business hubs of the city.

Safety Parameters and Inspection

3. Inspection by CMRS

Before launching this new section of Bengaluru Metro, a thorough inspection was done by the Metro Railway Safety Commissioner (CMRS). This inspection was done on October 3, which confirmed all the safety parameters.

4. Train Testing and Speed ​​Testing

BMRCL ran a special train on this new route, which conducted speed tests with OMS 2000 System. During these tests, the train achieved a maximum speed of 80 km/h and successfully crossed the safety parameters.

5. Continuous Automatic Train Control System (CATC)

The Continuous Automatic Train Control System for this new metro line was also inspected, ensuring the speed and safety of the trains. The line was considered ready for commercial use only after reviewing all the necessary documents and certifications.

Local Passengers and Connectivity Benefits

6. Benefits for Passengers

The main objective of the Madavara-Nagasandra Metro line is to provide smooth travel facilities to local commuters. This will not only be beneficial for everyday commuters but will also help business travellers to reach different parts of Bengaluru easily.

7. Reduction in Pollution

This metro line will be helpful in reducing the increasing vehicles and pollution in Bengaluru. More people will use the metro, which will reduce road traffic and carbon emissions.

Future of Metro Network

8. Other Important Expansions

BMRCL also has other important metro expansion plans. As this network expands, the city’s connectivity will improve even more. The addition of this new section has increased the possibility of even bigger metro plans in the future.

9. Connectivity to the Airport

One of the main objectives of the Bengaluru Metro in the upcoming projects is to increase connectivity to the city’s airport. This will be extremely convenient for international and domestic travellers.

Economic impact of metro expansion

10. Employment opportunities

The expansion of the metro will create new employment opportunities in Bengaluru. Its construction and operation will provide employment to thousands of people, which will have a positive impact on the local economy.

11. Connectivity of business areas

The new route of the metro will provide better connectivity to various business areas, which is expected to increase business activities there. This will play an important role in the economic progress of the city.

New standards of safety

12. Automatic train operation system

A state-of-the-art automatic train operation system has been installed in this metro line, making the operation of trains even more safe and reliable. The safety of passengers is the top priority of BMRCL.

13. Steps towards environmental protection

Environmentally friendly techniques have been used in the construction of this metro line. Important steps like tree plantation and energy conservation have been taken during construction, so that it does not have a negative impact on the environment.

Features of Metro Operations

14. Start of Operations

This metro line may be fully ready for operation in the second or third week of October, although no official announcement has been made by BMRCL yet.

15. Passenger Amenities

Modern facilities will be available for passengers, such as automatic ticket machines, digital indicators, and smart card facility. This will make the travel experience of passengers even more seamless.

Conclusion

The start of metro operations between Madavara and Nagasandra is an important step for the city of Bengaluru. It will not only reduce traffic problems but will also strengthen the connectivity of the city. In the coming time, this metro line will see a big change in the traffic and economic structure of Bengaluru.


Frequently Asked Questions (FAQs)

1. When will the Madavara-Nagasandra metro line be operational?

This metro line may be operational in the second or third week of October, although no official date has been announced yet.

2. What is the total length of this metro line?

The total length of this metro line is 3.7 km.

3. What is the cost of this metro line?

This metro line has been constructed at a cost of Rs 298 crore.

4. Is this metro line connected to Bangalore International Exhibition Centre?

Yes, this metro line connects Bangalore International Exhibition Centre (BIEC) to Tumkur Road.

5. What safety inspection was done for this metro line?

This metro line was inspected by the Commissioner of Metro Railway Safety (CMRS) and found to be compliant with safety standards.

Leave a Comment